Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
4979501 | Journal of Hazardous Materials | 2017 | 7 Pages |
Abstract
A lab-scale Sequencing Batch Reactor (SBR) was implemented to investigate biological treatability and kinetic characteristics of paint shop wastewater (PSW) together with main stream wastewater (MSW) of a bus production factory. Readily biodegradable and slowly biodegradable COD fractions of MWS were determined by respirometric analysis: 4.2% (SS), 10.4% (SH) and 59.3% (XS). Carbon and nitrogen removal performance of the SBR feeding with MSW alone were obtained as 89% and 58%, respectively. When PSW was introduced to MSW, both carbon and nitrogen removal were deteriorated. Model simulation indicated that maximum heterotrophic growth rate decreased from 7.2 to 5.7Â dayâ1, maximum hydrolysis rates were reduced from 6 to 4Â dayâ1 (khS) and 4 to 1Â dayâ1 (khX). Based on the dynamic model simulation for the evaluation of nitrogen removal, a maximum specific nitrifier growth rate was obtained as 0.45Â dayâ1 for MSW feeding alone. When PSW was introduced, nitrification was completely inhibited and following the termination of PSW addition, nitrogen removal performance was recovered in about 100 days, however with a much lower nitrifier growth rate (0.1Â dayâ1), possibly due to accumulation of toxic compounds in the sludge. Obviously, a longer recovery period is required to ensure an active nitrifier community.
Related Topics
Physical Sciences and Engineering
Chemical Engineering
Chemical Health and Safety
Authors
Didem Güven, Oytun Hanhan, Elif Ceren Aksoy, Güçlü Insel, Emine Ãokgör,