Abstract
The article proposes a multi-project Baltic States - Continental Europe Synchronous Interconnection Scenario for 2014-2027, with the insight to the former development of the Baltic Power System and a short listing of synchronous interconnection precedents in Europe. The study identifies and discusses the major operational challenges for the Baltic Power System in synchronously connecting the Continental European Network (CEN) via the recently commissioned Polish-Lithuanian tie LitPol Link1 and the projected LitPol Link2. The HVDC converter stations on asynchronous ties with Russia, Belarus and Nordic systems are recommended for the exchange of frequency containment and restoration reserves, notably in the DC-supported island operation condition of the Baltic Power System.
Keywords
CHPWAMSOHLCCGTHVDCTSOAGCLFCCENNPPHPPTransmission system operatorCombined cycle gas turbineAlternating currenthigh voltage direct currentDC, Direct currentoverhead linePower systemPower planthydro power plantnuclear power plantAutomatic generation controlLoad-frequency controlCombined heat and power plant
Related Topics
Physical Sciences and Engineering
Energy
Energy Engineering and Power Technology
Authors
Virginijus Radziukynas, Arturas Klementavicius, Sigitas Kadisa, Neringa Radziukyniene,