Article ID Journal Published Year Pages File Type
5001395 Electric Power Systems Research 2016 16 Pages PDF
Abstract
In this context, the normalized transient signal due to reduced impulse voltage is considered to be first basis function. The next successive impulse sequences of the transient signals due to rated impulse test voltage are made mutually orthogonal to previous transient signals through projection theorem. The constructed orthogonal signal is normalized for formulation of orthonormalized basis signal. If the surge characteristic of the winding is changed due to faults during the rated impulse test voltage, then the mutual effective coefficient needs to identify the deviation based on 'best mutual matches' between orthonormalized basis signal and first basis function. The mutual effective coefficient makes a 'best mutual matches' through appropriate mathematical formulation to provide the occurrence or non-occurrence of faults. To express the performance of the mutual effective coefficient, 5 MVA, 7.5 MVA, 150 MVA transformers, 80 Mvar shunt reactor and 22 kV interleaved disc winding are considered.
Related Topics
Physical Sciences and Engineering Energy Energy Engineering and Power Technology
Authors
,