Article ID Journal Published Year Pages File Type
5001485 Electric Power Systems Research 2017 10 Pages PDF
Abstract
device utilizing both measurements was build and tested for different initial short-circuit instants, with respect to the synchronous generator phase voltages. In every case, the switch-off time of the short circuit was not longer than 0.4 s, what means that the protection against the risk of electric shock was effective. The settings of the device are fully adjustable, what means that levels of the measured quantities indicating trip as well as the reaction time are adjustable.
Related Topics
Physical Sciences and Engineering Energy Energy Engineering and Power Technology
Authors
, , ,