Abstract
												The developed innovative repair technology has been successfully applied to the Oktyabrskaya Railway, or October Railway, since 2013 for repair and reconstruction of stone and concrete culverts of long-term operation and pipes of various outlines of openings ranging in size from 1.5 m to 4.2 m, including in the conditions of permanent watercourse, while a pipe is filled by flow up to 1.6 m of its section.