Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
5027753 | Procedia Engineering | 2017 | 6 Pages |
Abstract
The developed innovative repair technology has been successfully applied to the Oktyabrskaya Railway, or October Railway, since 2013 for repair and reconstruction of stone and concrete culverts of long-term operation and pipes of various outlines of openings ranging in size from 1.5 m to 4.2 m, including in the conditions of permanent watercourse, while a pipe is filled by flow up to 1.6 m of its section.
Keywords
Related Topics
Physical Sciences and Engineering
Engineering
Engineering (General)
Authors
A.N. Perminov, I.P. Safonov, N.A. Perminov,