Article ID Journal Published Year Pages File Type
5028190 Procedia Engineering 2017 10 Pages PDF
Abstract
In accordance with the geological and geotechnical studies developed in 2011, was necessary mitigate the stress exerted on the pipe and to advance in works in order to protect pipes against the risk of new earthworks, earthquakes or other phenomena. The scheduling of activities started in July of 2011, beginning with the development of a drainage system to drain excess water and stabilize the soil. The alignment procedure did not require emptying pipes and was included the participation of about 100 people in each stage. This made possible the conception, adjustment and fabrication of realignment systems, brackets construction and fabrication of structures to support the machinery responsible for displace the pipes and dissipate the stress on pipes. The procedure developed did not require the service suspension due to the flexibility of the other two Water Treatment Plants: Manantiales and Villa Hermosa, which assumed the decreased flow in La Aruyá Water Treatment Plant [1], [2], [3].
Related Topics
Physical Sciences and Engineering Engineering Engineering (General)
Authors
, , ,