Article ID Journal Published Year Pages File Type
5030207 Procedia Engineering 2016 5 Pages PDF
Abstract

Achieving good results in applying artificial neural networks (ANN) in predicting requires some preparatory works on the set of data. One of them is standardization which is necessary when nonlinear activation function is applied. Basing on predicting completion period of building contracts by multi-layer ANN with error backpropagation algorithm, six different methods of input data standardization were checked in order to determine which allows to achieve the most accurate predictions.

Related Topics
Physical Sciences and Engineering Engineering Engineering (General)
Authors
, , ,