Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
5127804 | Computers & Industrial Engineering | 2017 | 4 Pages |
Abstract
â¢We consider the ordered and the proportionate flow shop with unequal machine speeds.â¢We consider both the Cmax and the âj=1nCj objectives.â¢We show that permutation schedules are dominant for Cmax with V-shaped speeds.â¢We show that permutation schedules are dominant for âj=1nCj with three stages.
Related Topics
Physical Sciences and Engineering
Engineering
Industrial and Manufacturing Engineering
Authors
S.S. Panwalkar, Christos Koulamas,