Article ID Journal Published Year Pages File Type
5444322 Energy Procedia 2017 8 Pages PDF
Abstract
The overall model is prepared to be coupled to the real plant control system which will allow virtual commissioning in the next step. This allows pre-tuning of control parameters as well as a weakness analysis which again helps to speed up the commissioning process. In General, the dynamic simulations proved to be a useful tool that deepened the insight and understanding of the plant operation at an early project phase and therefore greatly supported the making of design decisions. After commissioning, the calibrated simulation models will be used for monitoring purposes.
Related Topics
Physical Sciences and Engineering Energy Energy (General)
Authors
, , , ,