Article ID Journal Published Year Pages File Type
5445237 Energy Procedia 2017 8 Pages PDF
Abstract
This paper proposes an idea for the profit maximization of hybrid system. Wind plant and pumped storage hydro plant acts as a hybrid system. Profit calculation is mainly based on frequency. Contract is signed between hybrid system and grid. Deviations from contract make unscheduled interchange flow between hybrid system and grid. Load scheduling is implemented in the utility connected load to maximize their profit and to minimize unscheduled interchange flow. The effect of load scheduling on the profit of hybrid system for different wind power is analyzed and compared with the case without load scheduling.
Related Topics
Physical Sciences and Engineering Energy Energy (General)