Abstract
This paper deals with dynamic simulation of the 2nd generation 600 MW oxy fired CFB once trough boiler. In this paper we will present the dynamic model which includes oxy fired CFB boiler, turbine island, ASU and CPU with all needed equipment like heat exchangers, pipes, pumps, air and fuel feeding systems, distillation columns and sequestration vessels. Automation like measurements, controllers and actuators are included in the model. The simulation case selected for this paper presents an analysis what happens when one of the oxidant fans trips on boiler full load operation and how to handle this kind of failure by decreasing the boiler load to sufficient level of regarding the available oxidant feeding capacity. There were several items which were taken into account in the boiler, turbine island, ASU and CPU side when this kind of failure takes impact. The main findings in the failure analysis will be presented. Finally, discussion and future aspects of the simulation approach described will be given.
Related Topics
Physical Sciences and Engineering Energy Energy (General)
Authors
, , , ,