Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
5446089 | Energy Procedia | 2016 | 6 Pages |
Abstract
To alleviate environment pollution, it has become a tendency for energy adjustment that natural gas is taking the place of fossil fuels. The coupling between natural gas system and electric system is being strengthened by gas-fired power plants. A multi-time combined gas and electric system optimal power flow (M-GEOPF) model is proposed aiming at minimizing the overall cost. To address available wind power uncertainty, underestimation and overestimation of wind power are considered in the model. A test case on the combined IEEE 39-bus system and Belgium 20-node natural gas system is performed to verify the effectiveness of the proposed method.
Keywords
Related Topics
Physical Sciences and Engineering
Energy
Energy (General)
Authors
Shuang Chen, Guoqiang Sun, Zhinong Wei, Sheng Chen, Yichi Li,