Article ID Journal Published Year Pages File Type
5446691 Energy Procedia 2016 9 Pages PDF
Abstract
As a result, at latest in 2035, power-to-gas capacity expansion has to take place to reach required installed capacities of up to 89-134 GW in 2050. Application of power-to-gas as long-term flexibility leads to cost savings of up to 11,7-19 bn Euro enabling a fully renewable system in 2050.
Related Topics
Physical Sciences and Engineering Energy Energy (General)
Authors
, , , ,