Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
5469474 | Journal of Manufacturing Systems | 2017 | 11 Pages |
Abstract
The proposed scheduling optimization algorithm comprises three phases. First, the proportional distribution method is applied to optimize ANC assignment. Second, considering the component height as well as the pick, simultaneous pickup, and component shape restrictions, the MABCA generates the nozzle assignment. Third, under the constraints of place restriction and the predetermined nozzle assignment, the MABCA and the 2-opt algorithm generates the place sequence with the minimal PCB assembly time. Finally, the proposed algorithm is experimentally demonstrated. The average number of pickups in the solutions generated by the proposed method, the onsite engineer, and two related studies are 159.3, 167.2, 208.6, and 210.6, respectively. The proposed approach yields the least PCB assembly time. The average total assembly time (Ttotal) improved between on-site engineer and the proposed MABCA is 4.08%.
Keywords
Related Topics
Physical Sciences and Engineering
Engineering
Control and Systems Engineering
Authors
Cheng-Jian Lin, Mei-Ling Huang,