Article ID Journal Published Year Pages File Type
5469840 Procedia CIRP 2016 6 Pages PDF
Abstract
In this method, the assignment of assembly tasks to workstations is primarily based on their position in the assembly priority chart of the products being assembled. The application of the described method is shown in an example of a product-based modular automotive assembly system developed by the authors. In this context, the method is one main aspect of planning and operating a modular assembly system, which is supposed to handle the further increasing diversity and dynamics of the automotive industry by its high level of flexibility and changeability.
Related Topics
Physical Sciences and Engineering Engineering Industrial and Manufacturing Engineering
Authors
, , ,