| Article ID | Journal | Published Year | Pages | File Type | 
|---|---|---|---|---|
| 5470127 | Procedia CIRP | 2017 | 6 Pages | 
Abstract
												It can be observed that, given a certain fluctuation within the power supply, rescheduling the use-time of energy-flexible machine tool components leads to a higher utilization degree of the own supplied energy by renewables. This paper depicts a scenario that provides the preconditions for an economic operation of the proposed strategy.
											Related Topics
												
													Physical Sciences and Engineering
													Engineering
													Industrial and Manufacturing Engineering
												
											Authors
												Richard S.-H. Popp, Corinna Liebl, Michael F. Zaeh, 
											