Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
5492589 | Nuclear Instruments and Methods in Physics Research Section A: Accelerators, Spectrometers, Detectors and Associated Equipment | 2017 | 7 Pages |
Abstract
The Japan Proton Accelerator Research Complex (J-PARC) aims at achieving a megawatt-class proton accelerator facility. One promising method for increasing the beam power is to shorten the repetition cycle of the main ring from the current cycle of 2.48 s to 1.3 s. In this scheme, however, the increase in the output voltage and the power variation of the electric system are serious concerns for the power supplies of the main magnets. We have been developing a new power supply that provides solutions to these issues. Recently, we proposed a new method for high-powered tests of the converter that does not require a large-scale load and power source. We carried out a high-powered test of â¼100 Â kVA for the prototype DC/DC converters of the new power supply with this method. This paper introduces the design of the power supply and the results of the high-powered test for the prototype DC/DC converters.
Related Topics
Physical Sciences and Engineering
Physics and Astronomy
Instrumentation
Authors
Yuichi Morita, Yoshinori Kurimoto, Kazuki Miura, Ryu Sagawa, Tetsushi Shimogawa,