Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
5757186 | Groundwater for Sustainable Development | 2017 | 37 Pages |
Abstract
Fig. 6. Dendrogram of cluster analysis for 30 sampling stations. Fig. 7. Factor loadings, Factor 1 vs. Factor 2 in the case of principal component analysis. Fig. 8. The discharge waste water from the BTPP to the Tilai river at the connecting point of the discharge channel of thermal power plant.252
Related Topics
Life Sciences
Environmental Science
Pollution
Authors
M. Farhad Howladar,