Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
577803 | Journal of Hazardous Materials | 2012 | 9 Pages |
Abstract
⺠NDVI-based ecological valuation made the problem formulation of ERA place-based. ⺠PERI computation made the ecological risks prioritizing of HM quantitatively. ⺠Detecting ecological hotspots with low, moderate and high HM ecological risks. ⺠Identifying the priority management areas with different HM ecological risk levels.
Related Topics
Physical Sciences and Engineering
Chemical Engineering
Chemical Health and Safety
Authors
S.B. Fang, X.B. Jia, X.Y. Yang, Y.D. Li, S.Q. An,