Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
5787644 | Engineering Geology | 2017 | 7 Pages |
Abstract
This paper presents a case history of the 205Â m high intake slope at the Huangjinping (HJP) hydropower station on the Dadu River. Deformation and cracks developed on the cut slope during excavation, and the deformation extended onto the natural slope above the cut, giving rise to serious safety concerns. Research was conducted to study the engineering geological conditions and the deformation characteristics of the slope during excavation. In situ monitoring data and possible causes of cracking were analyzed. The results show that the zone of loosened rock mass extended much deeper into the rock mass than it did at other sites in the region because of the tectonic history of the site and cutting. The empirically designed cable anchors with lengths of 40Â m or 45Â m were insufficient to stabilize the slope, while the remedial cable anchors as long as 100Â m successfully stabilized the slope. The analytic method and procedure used in this paper could be useful to similar projects.
Keywords
Related Topics
Physical Sciences and Engineering
Earth and Planetary Sciences
Geotechnical Engineering and Engineering Geology
Authors
Tao Chen, Jianhui Deng, Nicholas Sitar, Jun Zheng, Tiexin Liu, Aijuan Liu, Lu Zheng,