Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
624537 | Desalination | 2012 | 6 Pages |
Abstract
⺠Fast start-up of ANAMMOX reactor was achieved without taking deoxygenated measures. ⺠Nitrogen removal of 2.0 kg/m3/d on day 35 and 6.2 kg/m3/d on day 91 was achieved. ⺠The pH, conductivity, and effluent NO3--N were indicators of ANAMMOX performance.
Related Topics
Physical Sciences and Engineering
Chemical Engineering
Filtration and Separation
Authors
Huosheng Li, Shaoqi Zhou, Weihao Ma, Guotao Huang, Bin Xu,