Article ID Journal Published Year Pages File Type
624537 Desalination 2012 6 Pages PDF
Abstract
► Fast start-up of ANAMMOX reactor was achieved without taking deoxygenated measures. ► Nitrogen removal of 2.0 kg/m3/d on day 35 and 6.2 kg/m3/d on day 91 was achieved. ► The pH, conductivity, and effluent NO3--N were indicators of ANAMMOX performance.
Related Topics
Physical Sciences and Engineering Chemical Engineering Filtration and Separation
Authors
, , , , ,