Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
6358320 | Marine Pollution Bulletin | 2014 | 10 Pages |
Abstract
The IMO Marine Environment Protection Committee (MEPC 59/24/Add.1 Annex 9) requires the wash water to reach a pH greater than 6.5 at a distance of 4Â m from the point of discharge. We examine the engineering constraints, specifically size and number of ports, to identify the challenges of meeting regulatory compliance.
Keywords
Related Topics
Physical Sciences and Engineering
Earth and Planetary Sciences
Oceanography
Authors
H. Ãlpre, I. Eames,