Article ID Journal Published Year Pages File Type
640746 Separation and Purification Technology 2015 8 Pages PDF
Abstract
Cost breakdown for the optimum configuration of the membrane system for the arsenic (V) removal from drinking water. CC: capital costs; OC: operating costs. The item with the highest cost is related to electricity consumption: 35% of the total cost.
Related Topics
Physical Sciences and Engineering Chemical Engineering Filtration and Separation
Authors
, , ,