Article ID Journal Published Year Pages File Type
6594992 Computers & Chemical Engineering 2018 29 Pages PDF
Abstract
This work aims to reduce the global resource consumption in an industrial evaporation network by better tasks management and coordination. The network works in continuous, processing some products in several evaporation plants, so optimal load allocation and product-plant assignment problems appear. The plants have different features (capacity, equipment, etc.) and their performance is affected by fouling inside the heat exchangers and external factors. Hereby, the optimizer has to decide when maintenance operations have to be triggered. Therefore, a mixed production/maintenance scheduling problem arises. The plant behavior is approximated by surrogate linear models obtained experimentally, allowing thus the use of mixed-integer linear optimization routines to obtain solutions in acceptable time. Furthermore, uncertainty in the weather forecast and in the production plan is also considered via a two-stage stochastic programming approach. Finally, a trade-off analysis between other objectives of interest is given to support the decision maker.
Related Topics
Physical Sciences and Engineering Chemical Engineering Chemical Engineering (General)
Authors
, , , , ,