Article ID Journal Published Year Pages File Type
6595620 Computers & Chemical Engineering 2014 12 Pages PDF
Abstract
The integration of scheduling and control in the process industry is a topic that has been frequently discussed during the recent years, but many challenges remain in order to obtain integrated solutions that may be implemented at large-scale industrial sites. This paper introduces a general framework for production scheduling (PS) and detailed production scheduling (DPS) using a two-level hierarchical approach. The PS activity generates a monthly production schedule based on information on orders and forecasts, and the DPS activity handles disturbances in production on an hourly basis. The focus is on disturbances in the supply of utilities, which often cause great losses at process industrial sites. The research has been conducted in close collaboration with Perstorp, a world-leading company within several sectors of the specialty chemicals market. A specification list provided by Perstorp has been used as a starting point for formulating the PS and DPS activities as optimization problems. An example that is inspired by a real industrial site is presented to show how the PS and DPS may operate and how the integration of these two functions behaves.
Related Topics
Physical Sciences and Engineering Chemical Engineering Chemical Engineering (General)
Authors
, ,