Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
6658835 | Hydrometallurgy | 2018 | 22 Pages |
Abstract
The H2020 BIOMOre project (www.biomore.info, Grant Agreement #642456) tests the feasibility of in situ bioleaching of copper in deep subsurface deposits in the Rudna mine, Poland. Copper is leached using biologically produced ferric iron solution, which is recycled back to the in situ reactor after re-oxidation by iron-oxidizing microorganisms. From a post operational point of view, it is important that the biological processes applied during the operation can be controlled and terminated. Our goal was to determine the possibility to use natural saline mine water for the inactivation of the introduced iron-oxidizing microorganisms remaining in the in situ reactor after completion of the leaching process of the ore block. Aerobic and anaerobic microcosms containing acid-leached (pHâ¯2) sandstone or black shale from the Kupferschiefer in the Rudna mine were further leached with the effluent from a ferric iron generating bioreactor at 30â¯Â°C for 10â¯days to simulate the in situ leaching process. After the removal of the iron solution, residing iron-oxidizing microorganisms were inactivated by filling the microcosms with chloride-rich water (65â¯gâ¯Lâ1 Clâ) originating from the mine. The chloride-rich water irreversibly inactivated the iron-oxidizing microorganisms and showed that the naturally occurring saline water of the mine can be used for long-term post process inactivation of bioleaching microorganisms
Keywords
Related Topics
Physical Sciences and Engineering
Chemical Engineering
Chemical Engineering (General)
Authors
Malin Bomberg, Hanna Miettinen, Margareta Wahlström, Tommi Kaartinen, Sarita Ahoranta, Aino-Maija Lakaniemi, Päivi Kinnunen,