Article ID Journal Published Year Pages File Type
6658897 Hydrometallurgy 2018 35 Pages PDF
Abstract
The proposed solution method is validated experimentally using existing tests of column leaching using iodine-based lixiviants. The obtained results show good agreement with the experimental data. In addition, the results indicate that the rate of effluent gold concentration increases until its maximum when the flow velocity, concentration of iodine lixiviants, or specific surface increase. After the peak, the behaviour is more complex and the obtained results allow to optimise the amount of recovered gold.
Related Topics
Physical Sciences and Engineering Chemical Engineering Chemical Engineering (General)
Authors
, , , , , ,