Article ID Journal Published Year Pages File Type
6743944 Fusion Engineering and Design 2017 6 Pages PDF
Abstract
Since the signatures of ITER divertor Procurement Arrangements, material purchases, process qualification as well as manufacturing of full-scale prototypes have progressed. This paper provides a brief summary of the ITER divertor materials, the requirements for these materials, and the requirements for manufacturing and inspection of the divertor components. Experiences to be acquired through the prototype manufacturing activities are also discussed.
Related Topics
Physical Sciences and Engineering Energy Energy Engineering and Power Technology
Authors
, , , , , , ,