Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
6745605 | Fusion Engineering and Design | 2015 | 6 Pages |
Abstract
The manufacturing line of the ITER Correction Coils (CC) at ASIPP in Hefei (China) was completed in 2013 and the manufacturing line of the ITER Central Solenoid (CS) modules is under installation at General Atomic premises in Poway (USA). In both cases, before starting production of the first coils, qualification of the manufacturing procedures is achieved by the construction of a set of mock-ups and prototypes to demonstrate that design requirements defined by the ITER Organization are effectively met. For each qualification item, the corresponding mock-ups are presented with the tests to be performed and the related acceptance criteria. The first qualification results are discussed.
Related Topics
Physical Sciences and Engineering
Energy
Energy Engineering and Power Technology
Authors
Paul Libeyre, Hongwei Li, Wayne Reiersen, Nello Dolgetta, Cornelis Jong, Charles Lyraud, Neil Mitchell, Adamo Laurenti, Stefano Sgobba, Bernard Turck, Nicolai Martovetsky, David Everitt, K. Freudenberg, Steve Litherland, Peter Rosenblad, John Smith,