Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
6746384 | Fusion Engineering and Design | 2013 | 4 Pages |
Abstract
In the framework of the Broader Approach Agreement for the construction of the JT-60SA tokamak, ENEA is in charge to provide 9 of the 18 Toroidal Field (TF) coils. The 9 coils are being manufactured by ASG superconductors in Genoa under the supervision of ENEA in collaboration with the JT-60SA European home team. Prior the manufacturing, a preparatory activity has been carried out aimed at designing, constructing and setting-up the relevant components to be realized. In order to get confidence of some special manufacturing process, several qualification activities have been performed. In this paper an overview of the principal milestones reached during the preparatory phase and a description of the qualification activities with relevant test results are presented.
Keywords
Related Topics
Physical Sciences and Engineering
Energy
Energy Engineering and Power Technology
Authors
Antonio Cucchiaro, Gian Mario Polli, Valter Cocilovo, Giovanni Drago, Stefano Cuneo, Franco Terzi, Marc Peyrot, Guy Phillips, Valerio Tomarchio,