Article ID Journal Published Year Pages File Type
6747091 HBRC Journal 2017 13 Pages PDF
Abstract
Having proposed the model, it needed validation, which was done through implementing the model in organizations through automation projects. The implementation resulted in some changes in the model to achieve the required levels of accountability, responsibility, and transparency. These changes were incorporated into the model and were reflected in its modified version. Finally, the paper highlighted the recommended improvements that would enhance the future implementation of the model.
Related Topics
Physical Sciences and Engineering Engineering Civil and Structural Engineering
Authors
, ,