Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
6747452 | Hormign y Acero | 2016 | 20 Pages |
Abstract
There have been several manoeuvres other than the typical segment erection during the construction of the 1812 Constitution cable-stayed bridge over Cadiz Bay. These outstanding manoeuvres are: arrival to the first piers, main span deck closure, last segment erection, and connection between the stayed section and the approach viaduct on Puerto Real.
Related Topics
Physical Sciences and Engineering
Engineering
Civil and Structural Engineering
Authors
Conchita Lucas Serrano, Luis Peset González, Jesús de los RÃos de Francisco, José Manuel González Barcina,