Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
6747485 | Hormign y Acero | 2016 | 6 Pages |
Abstract
In order to control the construction process, the main structural parameters of the bridge have been instrumented and monitorized
Keywords
Related Topics
Physical Sciences and Engineering
Engineering
Civil and Structural Engineering
Authors
Vicente Puchol de Celis,