Article ID Journal Published Year Pages File Type
6752160 Journal of Rock Mechanics and Geotechnical Engineering 2018 18 Pages PDF
Abstract
This paper draws lessons learnt from a comprehensive case study in overconsolidated clay. Apart from the introduction of the case study, including field measurements, the paper draws on the observations and a three-dimensional (3D) numerical analysis to discuss the implications of observations in the application of the observational method (OM) in the context of the requirements of EUROCODE 7 (EC7). In particular, we focus on corner effects and time-dependent movements and provide initial guidance on how these could be considered. Additionally, we present the validation of a new set of parameters to check that it provides a satisfactory compliance with EC7 as a set of design parameters. All these findings and recommendations are particularly important for those who want to use the OM in similar future projects.
Related Topics
Physical Sciences and Engineering Earth and Planetary Sciences Geotechnical Engineering and Engineering Geology
Authors
, , ,