Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
6759367 | Nuclear Engineering and Design | 2018 | 11 Pages |
Abstract
The pre-licensing design of an HTGR cogeneration test plant to be coupled to JAEA's existing test reactor HTTR is discussed. The plant is designed to demonstrate the system of JAEA commercial plant design of Gas Turbine High Temperature Reactor for Cogeneration (GTHTR300C). More specifically the test plant (HTTR-GT/H2) aims to 1) demonstrate licensability of the GTHTR300C system for electricity and hydrogen cogeneration and 2) confirm operation and safety performance of such cogeneration system. With construction planned to be completed around 2025, the test plant is expected to be the first-of-a-kind nuclear system operating on two of the advanced energy conversion systems attractive for the HTGR - closed cycle helium gas turbine for power generation and thermochemical iodine-sulfur water-splitting process for hydrogen production.
Related Topics
Physical Sciences and Engineering
Energy
Energy Engineering and Power Technology
Authors
Xing L. Yan, Hiroyuki Sato, Junya Sumita, Yasunobu Nomoto, Shoichi Horii, Yoshiyuki Imai, Seiji Kasahara, Koichi Suzuki, Jin Iwatsuki, Atsuhiko Terada, Yukio Tachibana, M. Oono, S. Yamada, Kazumasa Suyama,