Article ID Journal Published Year Pages File Type
6760019 Nuclear Engineering and Design 2016 13 Pages PDF
Abstract
The increasing importance of Best-Estimate Plus Uncertainty (BEPU) analyses in nuclear safety and licensing processes have lead to several international activities. The latest findings highlighted the uncertainties of physical models as one of the most controversial aspects of BEPU. This type of uncertainties is an important contributor to the total uncertainty of NPP BE calculations. Due to the complexity of estimating this uncertainty, it is often assessed solely by engineering judgment. The present study comprises a comparison of two different state-of-the-art methodologies CIRCÉ and IPREM (FFTBM) capable of quantifying the uncertainty of physical models. Similarities and differences of their results are discussed through the observation of probability distribution functions and envelope calculations. In particular, the analyzed scenario is core reflood. Experimental data from the FEBA and PERICLES test facilities is employed while the thermal hydraulic simulations are carried out with RELAP5/mod3.3. This work is undertaken under the framework of PREMIUM (Post-BEMUSE Reflood Model Input Uncertainty Methods) benchmark.
Related Topics
Physical Sciences and Engineering Energy Energy Engineering and Power Technology
Authors
, , ,