Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
6763137 | Nuclear Engineering and Design | 2013 | 8 Pages |
Abstract
This article describes the approach to this verification by launching several comprehensive process qualification programmes consisting of mechanical analyses as well as static and dynamic testing programmes. The result was a qualified roll-expanded plug which remains leak-tight even during off-design conditions.
Related Topics
Physical Sciences and Engineering
Energy
Energy Engineering and Power Technology
Authors
J. Beck, R. Ziegler, N. Schönheit,