Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
6763257 | Nuclear Engineering and Design | 2013 | 6 Pages |
Abstract
The spherical fuel elements were successfully manufactured in the period of HTR-10. In order to satisfy the mass production of fuel elements for HTR-PM, several measures have been taken in modifying and optimizing the manufacture process of fuel elements. The newly developed overcoater system and its corresponding parameters exhibited good stability and high efficiency in the preparation of overcoated particles. The optimized carbonization process could reduce the carbonization time from more than 70Â h to 20Â h and improve the manufacturing efficiency. Properties of the manufactured spherical fuel elements and matrix graphite balls met the design specifications for HTR-PM. The mean free uranium fraction of 5 consecutive batches was 8.7Â ÃÂ 10â6. The optimized fuel elements manufacturing process could meet the requirements of design specifications of spherical fuel elements for HTR-PM.
Keywords
Related Topics
Physical Sciences and Engineering
Energy
Energy Engineering and Power Technology
Authors
Zhou Xiangwen, Lu Zhenming, Zhang Jie, Liu Bing, Zou Yanwen, Tang Chunhe, Tang Yaping,