Article ID Journal Published Year Pages File Type
6765558 Renewable Energy 2016 8 Pages PDF
Abstract
This paper elaborates on the costs and benefits of expanding the Austrian transmission system and the implementation of innovative grid-impacting technologies (e.g. flexible AC transmission systems (FACTS), dynamic line rating (DLR)) to support further integration of renewable energy sources for electricity generation (RES-E). Therefore, a fundamental market model has been developed - respecting DC load flows - and applied for analysing different future scenarios, notably for the time horizon 2020, 2030 and 2050. Up to 2020 and 2030, special focus is put on the finalisation of the so-called “380 kV-level transmission ring” in Austria to enable enhanced RES-E integration. The results confirm that transmission power line expansion in the states of Salzburg and Carinthia is important to connect imports from Germany with pumped hydro storage capacities, on the one hand, and the wind farms in the east with the pumped hydro storages in the western part of Austria, on the other hand. For 2050, the results indicate that the implementation of FACTS and DLR can reduce RES-E curtailment significantly.
Related Topics
Physical Sciences and Engineering Energy Renewable Energy, Sustainability and the Environment
Authors
, ,