Article ID Journal Published Year Pages File Type
6767840 Renewable Energy 2015 9 Pages PDF
Abstract
Because of bottlenecks in the Swedish transmission system it is relevant to model certain areas separately. For the two southern areas the MAE were 3.7 and 4.2%. The northern area was harder to model and had a MAE of 6.5%. This might be explained by a low installed capacity, more complex terrain and icing losses not captured in the model.
Related Topics
Physical Sciences and Engineering Energy Renewable Energy, Sustainability and the Environment
Authors
, ,