Article ID Journal Published Year Pages File Type
678176 Biomass and Bioenergy 2010 11 Pages PDF
Abstract

Wildfire burnt forest biomass can be salvaged as feedstock for bioenergy power generating stations. Despite availability of such forest biomass in northwestern Ontario, its procurement has generally been considered uneconomic and no studies have looked into the cost of harvesting, processing, and transporting the burnt material for bioenergy production. In order to meet the demand of biomass for proposed and existing power generating stations using renewable fuels, a standard costing model is used to determine the feasibility of procuring biomass from burnt areas using a full-tree to roadside, roadside grinder to mill system. The case-study was conducted at the Hogarth Plantations near Thunder Bay, Ontario, Canada. The total cost incurred for processing and delivery of biomass from wildfire burnt area with a hauling distance of 7 km and total trip cycle time of 2.55 h was found to be $29.65 gt−1, with net energy content of 11.4 GJ gt−1. The total procurement cost depends on the hauling distance and a linear relationship between the two was established. The energy analysis found a net energy output to input ratio of 35:1 for the operation.

Related Topics
Physical Sciences and Engineering Chemical Engineering Process Chemistry and Technology
Authors
, , , ,