Article ID Journal Published Year Pages File Type
6783841 Tunnelling and Underground Space Technology 2015 7 Pages PDF
Abstract
A 6 km immersed tunnel of the Hong Kong-Zhuhai-Macao Bridge (HZMB) has been designed and funded. Once completed in 2016, the HZMB Tunnel will break the record of the 5.8 km BART Tunnel in the United States, although it will soon be overtaken by the ∼20 km Fehmarn Tunnel between Denmark and Germany that is to be completed in 2020. Construction of the HZMB Tunnel was started in 2011 and more than ten elements thus far have been installed on the site. This paper presents details about the challenges and solutions for the design and construction of the HZMB Tunnel on a strategic level. Special features of the HZMB Tunnel include a long length of 6 km, a deep water depth of almost 45 m, and a thick backfill of 23 m. Challenges include severe marine environment, strict requirements for waterproofing, construction of sections connecting the tunnel with artificial islands, and tunnel stability after future excavation of fairway trenches. Moreover, the HZMB Tunnel is challenged by possible sand liquefaction in seismic events, conservation of white Chinese dolphin, and waterway dispersion during construction. Details about the strategies are given in order to improve the immersed tunnel design and construction methods.
Related Topics
Physical Sciences and Engineering Earth and Planetary Sciences Geotechnical Engineering and Engineering Geology
Authors
, , ,