Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
6784290 | Tunnelling and Underground Space Technology | 2014 | 9 Pages |
Abstract
- We analyze the current trends in pipe bursting through a survey of 19 contractors.
- A total of 886 projects from 2007 to 2010 were studied.
- Results reveal that majority of time is spent on planning compared to actual bursting.
- Upsize of pipes greater than 50% of original diameter poses the greatest risks.
- A pipe bursting upsize technical envelope was developed.
Keywords
Related Topics
Physical Sciences and Engineering
Earth and Planetary Sciences
Geotechnical Engineering and Engineering Geology
Authors
Samuel T. Ariaratnam, Jason S. Lueke, John K. Michael,