| Article ID | Journal | Published Year | Pages | File Type |
|---|---|---|---|---|
| 6784408 | Underground Space | 2017 | 15 Pages |
Abstract
In this work, deformations and internal forces of an existing tunnel subjected to a closely overlapped shield tunneling are monitored and analyzed using a series of physical model experiments and numerical simulations. Effects of different excavation sequences and speeds are explicitly considered in the analysis. The results of the physical model experiments show that the bottom-up tunneling procedure is better than the top-down tunneling procedure. The incurred deformations and internal forces of the existing tunnel increase with the excavation speed and the range of influence areas also increase accordingly. For construction process control, real-time monitoring of the power tunnel is used. The monitoring processes feature full automation, adjustable frequency, real-time monitor and dynamic feedback, which are used to guide the construction to achieve micro-disturbance control. In accordance with the situation of crossing construction, a numerical study on the performance of power tunnel is carried out. Construction control measures are given for the undercrossing construction, which helps to accomplish the desired result and meet protection requirements of the existing tunnel structure. Finally, monitoring data and numerical results are compared, and the displacement and joint fracture change models in the power tunnel subject to the overlapped shield tunnel construction are analyzed.
Keywords
Related Topics
Physical Sciences and Engineering
Earth and Planetary Sciences
Geotechnical Engineering and Engineering Geology
Authors
Junlong Yang, Chen Liu, Qiushi Chen, Xiongyao Xie,
