Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
6846055 | Nuclear Energy and Technology | 2017 | 8 Pages |
Abstract
The above updates will improve the performance and reliability of the steam generator blowdown and drainage system as far as its design functions are concerned, this to result in the secondary circuit's water chemistry arranged so that to minimize the amount of deposits on the heat-exchange surface of the PGV-1000MKP steam generators.
Related Topics
Physical Sciences and Engineering
Energy
Nuclear Energy and Engineering
Authors
S.V. Yaurov, K.F. Galiev, A.V. Borovoy, A.S. Volnov,