Article ID Journal Published Year Pages File Type
6846120 Nuclear Energy and Technology 2016 5 Pages PDF
Abstract
The proposed system allows ensuring supply of electricity for covering auxiliary needs of the NPP during more than 72 h. Use of the steam turbine plant included in the composition of the combined cycle gas turbine unit is possible for covering auxiliary needs of the NPP in case of failure of gas turbine plants. Steam turbine can be operated due to the generation of additional steam during incineration of hydrogen in oxygen. With appropriate modernization the system allows using decay heat released in the nuclear reactor core. It was established that the proposed option of combining NPP with combined cycle gas turbine unit in combination with hydrogen generating complex allows enhancing reliability of supply of electricity for covering auxiliary needs of the NPP in emergency conditions accompanied with loss of electric power supply.
Related Topics
Physical Sciences and Engineering Energy Nuclear Energy and Engineering
Authors
,