Abstract
												It was established that thorium-loaded reactor installation with suggested design is the installation operated with fast and intermediate neutrons. Results of calculation allow making the conclusion that reactor installation with suggested configuration of the fuel block and the fuel pellet, as well as with the fuel composition in question can be operated during not less than 3500 effective days at the power level of 60 MW without reloading.