Article ID | Journal | Published Year | Pages | File Type |
---|---|---|---|---|
6846146 | Nuclear Energy and Technology | 2016 | 7 Pages |
Abstract
It was established that thorium-loaded reactor installation with suggested design is the installation operated with fast and intermediate neutrons. Results of calculation allow making the conclusion that reactor installation with suggested configuration of the fuel block and the fuel pellet, as well as with the fuel composition in question can be operated during not less than 3500 effective days at the power level of 60Â MW without reloading.
Related Topics
Physical Sciences and Engineering
Energy
Nuclear Energy and Engineering
Authors
I.V. Shamanin, S.V. Bedenko, Chertkov Yu.B.,