Article ID Journal Published Year Pages File Type
6846146 Nuclear Energy and Technology 2016 7 Pages PDF
Abstract
It was established that thorium-loaded reactor installation with suggested design is the installation operated with fast and intermediate neutrons. Results of calculation allow making the conclusion that reactor installation with suggested configuration of the fuel block and the fuel pellet, as well as with the fuel composition in question can be operated during not less than 3500 effective days at the power level of 60 MW without reloading.
Keywords
Related Topics
Physical Sciences and Engineering Energy Nuclear Energy and Engineering
Authors
, , ,