Article ID Journal Published Year Pages File Type
698269 Automatica 2006 8 Pages PDF
Abstract

Application of contract net protocol requires the development of a bid evaluation procedure specific to the problem. Care must be taken to apply contract net protocol to tasks that involve precedence constraints among different operations and heterogeneous resources. The lack of a process model in the original contract net protocol makes it difficult to determine the feasibility of the resulting contracts. We propose a model to facilitate the development of the bid evaluation procedure by extending our previous results to handle tasks with more complex process structure. We formulate an optimization problem to find a minimal cost feasible execution sequence for a task.

Related Topics
Physical Sciences and Engineering Engineering Control and Systems Engineering
Authors
,