Article ID Journal Published Year Pages File Type
704286 Electric Power Systems Research 2008 12 Pages PDF
Abstract

The paper suggests a method for effects evaluation of a few activities and measures, undertaken as a part of preventive maintenance of power transformers. The method enables calculation of expected failures repair cost and load curtailment cost. The method identifies minor and major failures. Power transformer is a complex system, consisting of five components (functional parts). It is assumed that each component has two independent, competing failure modes: wear-out failure mode, modeled by two-parameter Weibull distribution, and a chance failure mode, characterized by an exponential distribution. The application of the method is demonstrated for one transformer station (TS) 110/x kV/kV with 2 × 31.5 MVA transformers. Also, by applying the method, influence of system for condition monitoring of transformer windings and oil on failures repair cost and load curtailment cost is evaluated.

Related Topics
Physical Sciences and Engineering Energy Energy Engineering and Power Technology
Authors
,