Article ID Journal Published Year Pages File Type
704385 Electric Power Systems Research 2016 8 Pages PDF
Abstract

•Transients caused by switching of three-phase 420 kV variable shunt reactor (VSR).•Model in EMTP-RV software with dynamic electric arc in SF6 circuit breaker.•Inrush currents due to VSR energization and overvoltages due to de-energization.•Overvoltages due to electric arc reignition.•Mitigation measures and operating switching strategy of VSR were proposed.

This paper describes transients caused by uncontrolled and controlled switching of three-phase 420 kV variable shunt reactor (VSR). The model for the analysis of the transients caused by switching of VSR was developed in the EMTP-RV software. It includes a dynamic electric arc in SF6 circuit breaker and the model of substation equipment. Inrush currents due to VSR energization and overvoltages due to de-energization were determined at tap positions corresponding to lowest 80 MVAr and highest 150 MVAr reactive power. Based on the calculation results, mitigation measures and operating switching strategy of VSR were proposed.

Related Topics
Physical Sciences and Engineering Energy Energy Engineering and Power Technology
Authors
, , ,